Flexible options for gas up, cool down operations.
Cryosafe Services have been actively involved in several gas up and cool down operations since our start up in September 2021. As opposed to a normal LNG STS operation there are a number of technical challenges to overcome that, if not addressed, could extend the time of the operation significantly. We have used our extensive experience in these LNG operations to specify an equipment and operational package that can overcome these challenges.
Working with our clients, partners and local authorities Cryosafe can assess the risk, fill in any procedural gaps and provide 3rd party assurance for these operations. Please contact us if you are considering GUCD operations with LNG carriers or LNG fuelling vessels gw@cryosafe.co.uk.